Downtown Redmond Link Extension – Parking Garage and Stations

About the Project

Hensel Phelps served as a teamed super subcontractor to Stacey and Witbeck/Kuney, a Joint Venture for the $731,596,000 Downtown Redmond Link Extension project. Hensel Phelps served as the design-builder for the 1400-stall, six-story, 615,000 SF Parking Garage and as the general contractor/construction manager for one at-grade station adjacent to the Parking Garage and one elevated station in downtown Redmond. The Downtown Redmond Station is pursuing LEED for Transportation Gold certification.

 

The Parking Garage is comprised of a post-tensioned, cast-in-place concrete system. Level 1 of the garage (at-grade) supports King County Metro and Sound Transit operations and features four active and eight layover bays for bus operations. The upper level features a 90 kW photovoltaic array and serves as a covered pedestrian walkway. To better blend with future mixed-use projects in the adjacent Marymoor Village area, the garage is clad with brick, glass, metal panels, perforated and articulated metal panels and tension mesh. A glass curtainwall clads two feature stairs at the south elevation.

 

The SE Redmond Station is an at-grade station adjacent to the garage and is accessed from the garage via a glass clad stair from Level 2 to the station platform. The 380-foot long platform is highlighted with a glass and metal clad canopy and multiple glass and steel wind screen structures. The platform surface is a precast concrete paver system with integral tactile wayfinding. This station provides two Ticket Vending Machine areas protected from the weather by glass and steel canopies.

 

The Downtown Redmond Station is the terminus of the East Link Extension and is constructed approximately 25’ above grade. The elevated platform is accessed via two entries, or head houses. Each head house features brick, glass and metal panel cladding and contains a stair, elevator and escalator. The site is heavily landscaped and includes plazas amenities for the City of Redmond to utilize as small-scale event space. The elevated guideway provides a storage tail track for rail car staging to support peak service demand times. This tail track features unique architectural treatments including brick and perforated panels to provide wayfinding and architectural interest at this terminus.

 

For more information, please visit the Sound Transit DRLE project page.

Quick Facts

  • Location Redmond, WA
  • Client Sound Transit
  • Industry Infrastructure + Transportation
  • Line of Business Construction
  • Completion Date September 9, 2024
  • Duration 60 Months
  • Contract Value $ 105,000,000
  • Sustainability Gold
  • Square Footage 615,000 SF
  • Other Features Light Rail

Related Projects

Contact Us

X

Oh no... this website is not a fan of Internet Explorer!

Due to some geeky technical reasons, the Hensel Phelps website is best viewed on any browser other than Internet Explorer. However, if you are a diehard IE fan you can continue to use it, but may have a less than great experience and will receive this annoying reminder every day. We recommend one of the following browsers to take full advantage of the Hensel Phelps website. Thank you!

Chrome   Firefox   Edge